InteGRail will enable information to be shared within the
Railway World to enable optimisation of decision making for
improved performance.
-
It will identify the information that is needed to be shared
(SP2)
-
It will ensure that the right information can be obtained
(SP3A)
-
It will identify ways of using the information more effectively
for maintenance optimisation (SP3B)
-
It will identify ways of combining and using information effectively
for management requirements (SP3C)
-
It will ensure that the information can be transmitted effectively
to the decision makers (SP3D)
-
It will demonstrate that creating the right information and
sharing it will enable performance improvement (SP4)
-
InteGRail will NOT replace existing systems. It will be used
in conjunction with existing systems.
|
|
|
 |
|
 |
|
 |
S
T A N D A R D I S A T I O N
|
 |
|
|
|
As
standardisation proposals are a primary goal, they will be given
high priority according to the following strategy:
1) prepare complete and detailed specifications as working documents,
involving all major actors and looking for maximum consensus
2) develop a significant working prototype system
3) test and validate the prototype in as much as possible close
to real life conditions
4) incorporate validation feedback into specifications and hand
them over to an appropriate standardisation body.
|
 |
|
 |
|